彩票快三赚钱平台,凤凰购彩平台app下载,cbin网站,官网快3,大众彩票welcome,大众彩票welcome,ag捕鱼登录

Strengthening

Location:Home>Strengthening

Business Building-National Technology Transfer Zhengzhou Center
2024-07-04 14:58:07

Project introduction: The total land area of the National Technology Transfer Zhengzhou Center Project has reached 22531.75m2 and the total construction area is 146494.74m2, of which the above-ground construction area is 104285.01m2, the underground construction area is 42209.73m2, the building base area is 8620.44m2, and the floor area ratio is 4.62. A total of 269 buckling supports were used in the project, including 104 in A zone, 90 in B zone and 75 in C zone. There are seven design values of yield capacity: 650KN, 1800KN, 4000KN, 6000KN, 7000KN, 10000KN, and 12000KN.

Application product: Buckling restraint support


1597996922179634.png  1597996927619157.png



城步| 安宁市| 潜山县| 桐乡市| 永春县| 大荔县| 郸城县| 茶陵县| 东宁县| 麦盖提县| 射洪县| 和政县| 梨树县| 新化县| 株洲市| 虹口区| 冷水江市| 乐安县| 新蔡县| 耒阳市| 呼玛县| 绥棱县| 师宗县| 赤峰市| 大丰市| 冕宁县| 通许县| 庆元县| 永平县| 青田县| 新河县| 上虞市| 东城区| 宕昌县| 镇康县| 邵阳市| 洛南县| 调兵山市| 襄城县| 胶州市| 珠海市|