彩票快三赚钱平台,凤凰购彩平台app下载,cbin网站,官网快3,大众彩票welcome,大众彩票welcome,ag捕鱼登录

Strengthening

Location:Home>Strengthening

National Energy Shuangjiangkou Hydropower Station Intelligent Monitoring Project
2024-07-04 15:11:15

11.jpg

222.jpg

Shuangjiangkou Hydropower Station is an upstream control reservoir project for hydroelectric cascade development in the Dadu River Basin, and one of the key projects in the development of cascade power stations in the Dadu River Basin. The earth-core wall rockfill dam is 314m high, ranking first in the world of its kind. In the feasibility study stage, it is recommended that the normal storage level of the reservoir is 2500 m, the dead water level is 2330 m, the maximum dam height is 312 m, the storage capacity below the normal storage level is 3.115 billion cubic meters, and the adjusted storage capacity is 2.152 billion cubic meters. It is an annual regulating reservoir. Increase the downstream cascade power station's dry season electricity by 6.6 billion kwh and increase the guaranteed output of 1.758 million kwh.

In this project, 3 self-sensing anchor rods and 3 self-sensing anchor cables are respectively arranged at the F3 fault of the cavern spill tunnel, the lamprophyre vein of the auxiliary powerhouse, and the 3# diversion tunnel entrance slope to strengthen the three sections Surrounding rock health monitoring capabilities.


五华县| 芮城县| 维西| 措勤县| 枞阳县| 武清区| 焦作市| 凤翔县| 宕昌县| 隆化县| 武威市| 富裕县| 嫩江县| 外汇| 元谋县| 张掖市| 保定市| 白河县| 新民市| 马山县| 吉木萨尔县| 平塘县| 泰宁县| 郸城县| 呈贡县| 平昌县| 江阴市| 徐汇区| 呼图壁县| 香港| 贡山| 家居| 卓尼县| 于都县| 岚皋县| 绥中县| 翁牛特旗| 伽师县| 贵阳市| 东平县| 北海市|